All Mains papers

General Studies IV

Ethics, integrity and aptitude, with case studies. Filter by topic or year.

3 questions

  • 2021 · Question 7 · Section B · Case study · 20 marks · 250 words

    Sunil is a young civil servant and has a reputation for his competence, integrity, dedication and relentness pursuit of difficult and onerous jobs. Considering his profile, he was picked up by his bosses to handle a very challenging and sensitive assignment. He was posted in a tribal dominated district notorious for illegal sand mining. Excavating sand from river belt and transporting through trucks and selling them in black market was rampant. This illegal sand mining mafia was operating with the support of local functionaries and tribal musclemen who in turn were bribing selected poor tribals and had kept the tribals under fear and intimidation. Sunil being a sharp and energetic officer immediately grasped the ground realities and the modus operandi followed by the mafia through their devious and dubious mechanism. On making inquiries, he gathered that some of their own office employees are in hand and glove with them and have developed close unholy nexus. Sunil initiated stringent action against them and started conducting raids on their illegal operations of movement of trucks filled with sand. The mafia got rattled as not many officers in the past had taken such strong steps against the mafia. Some of the office employees who were allegedly close to mafia informed them that the officer is determined to clean up the mafia's illegal sand mining operations in that district and may cause them irrepairable damage. The mafia turned hostile and launched counter-offensive. The tribal musclemen and mafia started threatening him with dire consequences. His family (wife and old mother) were stalked and were under virtual surveillance and thus causing mental torture, agony and stress to all of them. The matter assumed serious proportions when a muscleman came to his office and threatened him to stop raids, etc., otherwise, his fate will not be different than some of his predecessors (ten years back one officer was killed by the mafia).

    1. (a) Identify the different options available to Sunil in attending to this situation.

      undefined marks

    2. (b) Critically evaluate each of the options listed by you.

      undefined marks

    3. (c) Which of the above, do you think, would be the most appropriate for Sunil to adopt and why?

      undefined marks

    • Integrity under political pressure
    • Accountability in crises
    Source: UPSC, Civil Services (Main) 2021, General Studies IV (opens in a new tab)
  • 2021 · Question 9 · Section B · Case study · 20 marks · 250 words

    An elevated corridor is being constructed to reduce traffic congestion in the capital of a particular state. You have been selected as project manager of this prestigious project on your professional competence and experience. The deadline is to complete the project in next two years by 30 June, 2021, since this project is to be inaugurated by the Chief Minister before the elections are announced in the second week of July 2021. While carrying out the surprise inspection by inspecting team, a minor crack was noticed in one of the piers of the elevated corridor possibly due to poor material used. You immediately informed the chief engineer and stopped further work. It was assessed by you that minimum three piers of the elevated corridor have to be demolished and reconstructed. But this process will delay the project minimum by four to six months. But the chief engineer overruled the observation of inspecting team on the ground that it was a minor crack which will not in any way impact the strength and durability of the bridge. He ordered you to overlook the observation of inspecting team and continue working with same speed and tempo. He informed you that the minister does not want any delay as he wants the Chief Minister to inaugurate the elevated corridor before the elections are declared. Also informed you that the contractor is far relative of the minister and he wants him to finish the project. He also gave you hint that your further promotion as additional chief engineer is under consideration with the ministry. However, you strongly felt that the minor crack in the pier of the elevated corridor will adversely affect the health and life of the bridge and therefore it will be very dangerous not to repair the elevated corridor.

    1. (a) Under the given conditions, what are the options available to you as a project manager?

      undefined marks

    2. (b) What are the ethical dilemmas being faced by the project manager?

      undefined marks

    3. (c) What are the professional challenges likely to be faced by the project manager and his response to overcome such challenges?

      undefined marks

    4. (d) What can be the consequences of overlooking the observation raised by the inspecting team?

      undefined marks

    • Integrity under political pressure
    • Accountability in crises
    Source: UPSC, Civil Services (Main) 2021, General Studies IV (opens in a new tab)
  • 2021 · Question 10 · Section B · Case study · 20 marks · 250 words

    The coronavirus disease (COVID-19) pandemic has quickly spread to various countries. As on May 8th, 2020, in India 56342 positive cases of corona had been reported. India with a population of more than 1·35 billion had difficulty in controlling the transmission of coronavirus among its population. Multiple strategies became necessary to handle this outbreak. The Ministry of Health and Family Welfare of India raised awareness about this outbreak and to take all necessary actions to control the spread of COVID-19. Indian Government implemented a 55-day lockdown throughout the country to reduce the transmission of the virus. Schools and colleges had shifted to alternative mode of teaching-learning-evaluation and certification. Online mode became popular during these days. India was not prepared for a sudden onslaught of such a crisis due to limited infrastructure in terms of human resource, money and other facilities needed for taking care of this situation. This disease did not spare anybody irrespective of caste, creed, religion on the one hand and 'have and have not' on the other. Deficiencies in hospital beds, oxygen cylinders, ambulances, hospital staff and crematorium were the most crucial aspects. You are a hospital administrator in a public hospital at the time when coronavirus had attacked large number of people and patients were pouring into hospital day in and day out.

    1. (a) What are your criteria and justification for putting your clinical and non-clinical staff to attend to the patients knowing fully well that it is highly infectious disease and resources and infrastructure are limited?

      undefined marks

    2. (b) If yours is a private hospital, whether your justification and decision would remain same as that of a public hospital?

      undefined marks

    • Accountability in crises
    • Health
    Source: UPSC, Civil Services (Main) 2021, General Studies IV (opens in a new tab)